Please note that due to the need for regulation of manholes located within street. 16th July, the stretch between the intersection of the street. Hospital and the intersection of the street. Foundation, held from 10.04.2010 until 11.04.2010, the closed to wheeled vehicles will be cited. section above. street.
Therefore:
- in the street. Batory on the section between the streets of the 16th of July and the street. Hospital is currently inverted force direction. At the time of introduction of the above. changes, there will be two-way non-stop,
- led tours will be introduced to the street. July 16th through the streets of Bathory and the hospital and toward the street. Batorego streets and Strzybnego Farna. At this time in the street. Strzybnego, there will be one-sided (right side of the road) non-retention.
Show difficulty in moving a larger map
On behalf of the contractor of the work we apologize for the inconvenience caused and ask that you use caution and use the characters and signals associated with the change introduced by the organization of traffic.
0 comments:
Post a Comment